Avant At Met Square Reaches 28th Floor

Avant at Met Square Construction

Avant at Met Square Construction

Avant at Met Square has reached the 28th floor of the 43 story building. When we last looked in October 2016, the building just reached the 15th floor.

The glass had been installed at the base of the building and is starting to go in at the lower portion of the residential tower. 

Avent at Met Square will have a 19 screen movie theater and amenites include resort style pool, wellness center and dog salon.

The building is expected to be completed first quarter 2018.

Previous construction photos of Avant at Met Square can be viewed here.