1010 Brickell Construction Progress Photos

1010 Brickell Under Construction

1010 Brickell Under Construction

Since we last looked at 1010 Brickell in September, the cranes have been removed from the site and the building is progressing. 

There are only 6 more floors of before the balconies are completely installed. Work is being done on the rooftop pool, which is located on the South side. 

The Sieger Suarez designed building is expected to be completed Summer 2017.

Previous construction photos of 1010 Brickell can be viewed here.