Missoni Baia Reaches 10th Floor Of Construction

Missoni Baia Construction

Missoni Baia Construction

The 57 story Missoni Baia is rising quickly in Edgewater as construction reaches the 10th floor. At the end of April, construction was the the 4th floor.

Rising 649 feet, Missoni Baia will have 249 residential units.

Previous construction photos of Missoni Baia can be viewed here.