The Estates at Acqualina North Tower Reaches 36th Floor

The Estates at Acqualina Under Construction

The Estates at Acqualina Under Construction

The Estates at Acqualina North Tower has reached the 36th floor of construction before topping out at 50 stories and 667 feet.

Construction started going vertical on the North Tower almost a year ago in October 2019, while the 50 story South Tower topped off in May of this year.

Previous construction photos of The Estates at Acqualina can be viewed here.