Square Station Reaches 13th Floor

Square Station Construction

Square Station Construction

After starting construction in October 2016, Square Station has reached the 13th floor on the South Tower and the 12th Floor on the North Tower. 

The windows are being installed on the lower units and the jagged lines of the balconies are very apparent on the 710 unit building. 

Previous construction photos of Square Station can be viewed here.