The Estates at Acqualina South Tower Reaches 41st Floor

The Estates at Acqualina Construction

The Estates at Acqualina Construction

The Estates at Acqualina South Tower has reached the 41st floor after foundation work started in October 2018. Last month, construction was on the 36th floor.

The North and South Tower will top off at 50 stories.

Previous construction photos of The Estates at Acqualina can be viewed here.