Construction at Ten30 has reached the second floor. We are now only 2 floors away until top off! You can see the building coming to life above the site fencing. The covered parking garage is 75% complete. Installation of slab mechanical, electrical, plumbing is in progress.
The 4 story Ten30 South has reached the second floor and is halfway to top off. The building will have 43 residential units starting at $400,000 and is being developed by Shoma Group.