Rovr Development

Grand Station Topped Off At 30 Stories In Downtown Miami

Grand Station Topped Off

Grand Station Topped Off

The 30 story Grand Station has topped off in Downtown Miami.

Foundation began October 2019 and is expected to be competed before the end of the year.

Previous construction photos of Grand Station can be viewed here.

30 Story Grand Station Soon To Top Off

Grand Station Miami Construction

Grand Station Miami Construction

The 30 story Grand Station in Downtown Miami is close to topping off as construction is at the 29th floor. When we last looked in April, construction reached the 21st floor.

The building started going vertical in October 2019 and will have 300 rental units. There will be 44 studio units, 124 one bedroom units and 132 two bedroom units.

Previous construction photos of Grand Station can be viewed here.

Grand Station Reaches 21st Floor In Downtown Miami

Grand Station Construction

Grand Station Construction

Grand Station rises 6 more floors since last month, to 21 stories before it eventually tops off at 30 floors.

With 300 rental units, Grand Station is expected to be completed in 2021.

Previous construction photos of Grand Station can be viewed here.

Grand Station Miami Reaches 15th Floor Of Construction

Grand Station Miami Construction

Grand Station Miami Construction

Grand Station Miami is rising quickly in Downtown Miami as construction is at the halfway mark on the 30 story building with 300 apartments.

Construction started going vertical on the building in October 2019.

Grand Station Miami is being developed by Rovr Development with the Miami Parking Authority.

Previous construction photos of Grand Station Miami can be viewed here.