Golden Dusk Photography

One Thousand Museum Reaches 31st Floor

One Thousand Museum Reaches 31st Floor

Since reaching the 25th floor in November 2016, the 62 story One Thousand Museum is now at the halfway point and has reached the 31st floor. Just a little over a year ago in January 2016, One Thousand Museum was at the 5th floor.

As the windows continue to be installed, the exoskeleton of Zaha Hadid's design is taking shape, which allows to the building to have floor to ceiling windows and not have any interior columns. With 83 units, One Thousand Museum will also have a rooftop helipad. The first since Miami Tower in the 80's.

Read More

Midtown 29 Tops Off

Midtown 29 Topped Off

Midtown 29 Topped Off

Midtown 29, located at 180 NE 29th St has topped out in Midtown Miami. Construction on the 309 unit rental apartment started going vertical in August 2016. 

Construction is expected to be completed early 2018. 

Previous construction photos of Midtown 29 can be viewed here.

Square Station Is Rising Quickly

Square Station Under Construction

Square Station Under Construction

Located in the emerging Arts and Entertainment district of Miami, Square Station is starting to rise quickly. 

Square Station will have two towers with 710 rental units with both towers topping out at 34 stories. The South Tower is currently at the 5th floor and the North Tower is on the 3rd floor. 

In the Summer of 2011, the area was used as a set based on the Sunset Strip in Los Angeles as they filmed the movie Rock of Ages.

Previous construction photos of Square Station can be viewed here.

Canvas Condo Reaches 14th Floor

Canvas Condo 

Canvas Condo 

When we last looked at Canvas in September 2016, the 37 story building was on the 7th floor. Currently construction is up to the 14th floor.

The windows are starting to be installed at the base of the building. 

Previous construction photos of Canvas can be viewed here.

Biscayne Beach Construction Photos

Biscayne Beach in Edgewater

Biscayne Beach in Edgewater

Construction on the 51 story Biscayne Beach is moving along quickly since we last looked November 2016. 

The hoist has been removed from the front of the building and the exterior is being painted. Work has also started on the landscaping. 

Previous construction photos of Biscayne Beach can be viewed here.

Miami International Boat Show Prepping For Event At Miami Marine Stadium

Miami International Boat Show with the Miami Skyline in the Distance

Miami International Boat Show with the Miami Skyline in the Distance

The Miami International Boat Show is prepping for its event at the Miami Marine Stadium for February 16-20. The tents are completely set up and the docks for the yachts in the basin are nearly done. Once again, no events will be held inside the actual abandoned Miami Marine Stadium.

After getting approval to have the Boat Show at the Marine Stadium in 2015 for 2016 and 2017, this may be the last year at this location as $45 million in special obligation bonds were approved by Miami City Commissioners to restore the stadium. Preservation architect Richard Heisenbottle was chosen to design the renovation of the Stadium.

Photos from the set up in 2016 can be viewed here.

3 Miami Central Construction Photos

3 Miami Central Construction

3 Miami Central Construction

More progress is happening at 3 Miami Central since we last looked in October 2016.

The windows have have been installed on the back of the building while the front is now beginning to get windows. Parts of the exterior are now being painted. 

3 Miami Central will have 90,000 square feet of office space, 35,000 square feet of retail and 1,100 parking spaces.

Previous construction photos of 3 Miami Central can be viewed here.