MDM Group

Muze at Met Square Construction Photos

Muze at Met Square

Muze at Met Square

The under construction 43 story Muze at Met Square is getting closer to completion since we last looked in November 2017. 

Originally called Avant at Met Square, the name has changed to Muze at Met Square. 

With 391 rental apartments in Downtown Miami, Muze will also have SilverSpot movie theater in the building along with restaurants and retail. 

Construction started August 2015 and topped off June 2017.

Previous construction photos of Muze at Met Square can be viewed here.

Paramount Miami Worldcenter Reaches 45th Floor

Paramount Miami Worldcenter

Paramount Miami Worldcenter

Paramount Miami Worldcenter has reached the 45th floor of construction after previously reaching the 36th floor in early January.

The tower will top off at 60 stories and have 513 residential units.

Previous construction photos of Paramount Miami Worldcenter can be viewed here.

Paramount Miami Worldcenter Reaches 36th Floor Of Construction

Paramount Miami Worldcenter

Paramount Miami Worldcenter

Paramount Miami Worldcenter has reached the 36th floor of construction of the 60 story building after previously being on the 27th floor in November 2017.

Miami Worldcenter Associates filed plans that will go under review with Miami's Urban Development Review board on January 17th that will include new exterior changes.

Previous construction photos of Paramount Miami Worldcenter can be viewed here.

Block D Renderings

Avant at Met Square Construction Photos

Avant at Met Square

Avant at Met Square

Construction is progressing at Avant at Met Square since we last looked June and the 43 building just topped off. 

Construction began on the building in August 2015 after being delayed over the discovery of an ancient Tequesta village on the site.

Previous construction photos of Avant at Met Square can be viewed here.

Paramount Miami Worldcenter Construction Updates

Paramount Miami Worldcenter

Paramount Miami Worldcenter

Paramount Miami Worldcenter in Downtown Miami has reached the 27th floor of the 60 story building and close to the halfway mark. A year ago, the tower was just starting to go vertical.

In August, construction had reached the 19th floor and the windows were starting to be installed on the lower floors.

Previous construction photos of Paramount Miami Worldcenter can be viewed here.

Paramount Miami Worldcenter Reaches 19th Floor - Photos & Video

Paramount Miami Worldcenter

Paramount Miami Worldcenter

The 60 story Paramount Miami Worldcenter in Downtown Miami is steadily rising as it reaches the 19th floor after starting to go vertical in November 2016.

Glass is already starting to be installed on the building and the open air mall on the East side of the lot has already started going vertical. 

With 513 residential units, Paramount Miami Worldcenter is expected to be completed in 2018.

Previous construction photos of Paramount Miami Worldcenter can be viewed here.

Avant At Met Square Tops Off

Avant At Met Square Topped Off

The 43 story Avant At Met Square has topped out in Downtown Miami.

Construction began August 2015 and is expected to be completed first quarter 2018.

The windows are almost installed and painting has begun on the exterior of the building.

Previous construction photos of Avant at Met Square can be viewed here.