Square Station Construction Progress Photos

Square Station

Square Station

Both towers at Square Station are close to topping out with the South Tower at the 30th floor and the North Tower at the 28th floor. With 710 rental units, Square Station will top out at 34 stories.

The parking garage has been going vertical between the two buildings since we last looked in April. 

Construction on Square Station began in October 2016.

Previous construction photos of Square Station can be viewed here.