Construction

One Thousand Museum Construction Progress Photos

One Thousand Museum At the 60th Floor

One Thousand Museum At the 60th Floor

One Thousand Museum continues to rise and has reached the 60th floor of construction and is only 2 floors away from topping off. When we last looked in November 2017, construction was on the 57th floor.

The Zaha Hadid designed tower is expected to be completed by the end of the year.

Previous construction photos of One Thousand Museum can be viewed here.

Canvas Condo Construction Progress Photos

Canvas Condo

Canvas Condo

Located in the Arts & Entertainment district, the 37 story Canvas Condo is taking shape since we last looked in September. 

One of the cranes has been removed from the site and an illuminated Canvas sign sits atop the South side of the rooftop. The rooftop will have a 6,000 square feet indoor/outdoor restaurant with views of the city.

The building topped off in August of this year.

Previous construction photos of Canvas Condo can be viewed here. 

Square Station Construction Progress Photos

Square Station Construction

Square Station Construction

Since topping off in September, construction at Square Station is progressing very rapidly since starting to go vertical only a year ago. 

Two of the three cranes have been removed, most of the balconies have been installed and most of the exterior has been painted. Work on the amenities deck is taking shape as the landscaping will start soon. 

Square Station is expected to open early 2018.

Previous construction photos of Square Station can be viewed here.

 

The Optimum In Coconut Grove About To Go Vertical

The Optimum in Coconut Grove

The Optimum in Coconut Grove

After demolishing two buildings along Main Highway in Coconut Grove in July, The Optimum is now about to go vertical on a 14,000 square foot site. The Optimum is located next to the abandoned Coconut Grove Playhouse.

The five story office building will have 44,000 square feet of office space and 6,500 square feet for a rooftop restaurant. 

Construction is expected to be completed before the end of 2018.

Mr. C Coconut Grove Reaches 5th Floor

Engle Building Hotel

Engle Building Hotel

Construction on the 60,000 square foot Engle Building Hotel in Coconut Grove has reached the 5th floor.

In August of this year, the hotel was starting to go vertical.

Construction is expected to be completed in early 2019.

MiamiCentral Construction Photos

MiamiCentral Construction

MiamiCentral Construction

MiamiCentral is starting to take shape in Downtown Miami, especially compared to how it looked a year ago in November 2016.  

2 MiamiCentral is nearly completed and 3 MiamiCentral should be ready to open soon.

Brightline service is expected to begin first quarter 2018.

Previous construction photos since November 2014 can be viewed here.

Aston Martin Residences Under Construction

Aston Martin Residences Site

Aston Martin Residences Site

After being purchased for $125 million in July 2014, construction has begun on the Aston Martin Residences after an October groundbreaking.

The 66 story tower will have 390 residential units, two private lobbies, an infinity pool on the 55th floor and a two story fitness center.

Construction is expected to be completed in 2021.