Golden Dusk Photography

Icon Bay Construction Photos

Icon Bay Construction Site in Edgewater

Icon Bay Construction Site in Edgewater

Located 460 NE 28th St., Icon Bay is a condo developed by The Related Group in the emerging Edgewater district of Miami. 

Designed by Arquitectonica, Icon Bay will have 42 floors with a total height of 457 feet and will feature spectacular views of Biscayne Bay and Miami Beach. Plaza Construction is the contractor for the project.

Groundbreaking began in March 2013 and is expected to be completed by Spring of 2015. 

Below are current construction photos of Icon Bay.

Capital at Brickell Site Still For Sale

For Sale Sign at Capital at Brickell

For Sale Sign at Capital at Brickell

Located near the western edge of Brickell, Capital at Brickell was supposed to consist of two towers that would be residential, office and retail space. The two towers were going to rise 53 and 57 stories. However, the buildings fell victim to the recession in 2008 and construction never got started. 

While the 2.78 acre land sat empty for a few years, two Mexican Developers, Cabi Developers and Brickell Central were fighting for control of the land.

In 2013, CBRE began marketing the site for sale. Because of the location and the rapid development in Brickell the land was expected to exceed $100 million for bids. The current site is approved for 1.3 million square feet, but under the 2010 Miami 21 zoning code the new developer is allowed to expand to 3.2 million square feet. 

The land is still for sale and is currently listed under CBRE's available listings. 

Brickell City Centre Construction Photos

The Construction of Brickell City Centre Between 7th St.

The Construction of Brickell City Centre Between 7th St.

Brickell City Centre is still progressing rapidly since photos taken in April (2nd April photos) and last month in June. The two condo towers almost catching up in height to the hotel.

Reportedly, Condo North is now called Reach Brickell City Centre and Condo West is Rise Brickell City Centre.

Below are current construction photos.

Centro Lofts Miami Construction Progress Photos

Centro Lofts Miami Construction Site

Centro Lofts Miami Construction Site

Located in Downtown Miami, Centro Lofts Miami will feature 36 floors and 352 condominium units. The unique part of this building is that it will not have a parking garage for its residents. It will have 5 spots for a Car2Go service and bicycle parking. Residents that do have a car will have to park at a nearby city garage. 

Centrally located, residents have easy access to the metrorail, metromover and are within close walking distance to Bayfront Park. 

Developed by Newgard Group, the project broke ground in December 2013 and is expected to be completed by Spring 2015. 

Below are construction photos of the site.

SLS Brickell Construction Photos

SLS Brickell Construction Site

SLS Brickell Construction Site

Located at 1300 South Miami Avenue, SLS Brickell is a 52 story tower that will be comprised of 450 units and of course, an SLS hotel.

Amenities include the high end restaurants The Bazaar, Michael's and Katsuya. It will also have a sky roof pool, spa and Hyde Lounge.

Construction is expected to be completed by 3rd quarter of 2016.

Below are construction photos.

Montage at Met 3 Construction Progress Photos

Met 3 Construction Site

Met 3 Construction Site

Starting construction in December of 2012, ZOM Inc. purchased the air rights above the Met 3 to build 462 luxury condominiums units to be called Montage at Met 3. 

The building will have a Whole Foods on the ground level. Amenities will include a pool, yoga lawn, theatre room, BBQ area, gym and a spa.

Suffolk Construction is leading the construction on the site.

Inside the Abandoned Brickell Car Wash Concept

The Car Wash Conveyor Belt

The Car Wash Conveyor Belt

While workers clear out the site to build a Walgreens in Brickell, the lot was previously used as a car wash, called the Car Wash Concept. 

Located at 250 SW 7th St., the car wash was built and opened in 1999. For seven years the car wash was functioning and operating before it was finally closed in June 2006. When you walked around the building, all the calendars were open on June 2006 and it felt as if you were back in time. Surprisingly, despite sitting empty for so long, many vandals and graffiti artist were not in the building. There were many cobwebs and a lot of the stuff looked as if it was untouched since they left it in 2006. 

Walgreens purchased the lot this year and exactly eight years since it closed, the building was torn down in June 2014. 

Below are photos and a video of the building.