Panorama Tower Reaches 67th Floor

Panorama Tower Under Construction

Panorama Tower Under Construction

Panorama Tower has reached the 67th floor of construction and is only 18 floors away from topping out. The tower will reach 830 feet and be the tallest building in Miami. 

When we previously looked at Panorama Tower the building was on the 57th floor and already offered incredible views of the city from all angles.

Previous construction photos of Panorama Tower can be viewed here.

Southeast Financial Center Sold For $500M

Southeast Financial Center

After being put on the market in July, the Southeast Financial Center has been purchased for $500 million, according to The Real Deal. 

The 55 story office tower in Downtown Miami was built in 1984 with 1.225 million square feet in office space. The Skidmore, Owings & Merrill designed tower was purchased by billionaire Armando Ortega, who owns the clothing chain Zara.

The iconic Miami Tower recently sold for $220 million earlier this year.

Update: The official sale price is $516.6 million

38 Story Office Tower Proposed At 888 Brickell Avenue

888 Brickell Ave Rendering

888 Brickell Ave Rendering

A 38 story office tower has been proposed for the corner of Brickell Avenue and SE 10th Street at 888 Brickell Ave, according to The Next Miami. The site is across the street from the under construction 1010 Brickell.

The proposed office tower would have 304,950 square feet of space, retail and restaurant space and 264 parking spaces. It would reach a height of 472 feet.

Currently on the site is a 7 story office tower built in 1972. The building was purchased in 1984 for $6.3 million by Alphatur N.V. Corporation who are also developing the new tower.

The architect is Arquitectonica who have also designed the nearby Brickell City Centre, SLS Brickell, SLS Lux Brickell and Brickell Heights.

Arte By Antonio Citterio Condo Planned For Surfside

A 16 unit, 12 story condo called Arte By Antonio Citterio is coming to 8955 Collins Avenue. The site was purchased by ASRR Capital and Süzer Group for $40 million in 2015

An apartment built in 1952 has been demolished at the site.

Arte By Antonio Citterio is next to the under construction Surf Club Four Seasons next door. Construction is expected to be completed by the end of 2018.

Aria On The Bay Construction Progress Photos

Aria on the Bay Reaches 35th Floor

Aria on the Bay Reaches 35th Floor

Aria on the Bay is growing taller and has reached the 35th floor of the the 53 story condo. When we last looked at the project in August, Aria on the Bay was at the 20th floor.

The flowing curves of the tower are very visible on the Arquitectonica designed building. The balconies are now being installed on the first 6 floors, while the windows are continuing to be installed higher up. 

Aria on the Bay is being developed by Melo Group and is expected to be completed in 2017. 

Previous construction photos of Aria on the Bay from the beginning can be viewed here.

Faena Forum Now Open

Faena Forum Along Collins Avenue

Faena Forum Along Collins Avenue

As part of the Faena District spanning along Collins Avenue from 32nd to 36th street, Faena Forum is now open along with Faena Bazaar and Faena Park. Faena House and Faena Hotel were completed last year. We last   looked at the Faena Forum in August to show a night perspective of the building.

Faena Forum is a 42,565 square foot building designed for the arts, which will include lectures, events and performances. The cylinder like building was designed by Rem Koolhaas of OMA, who also designed the under construction Park Grove in Coconut Grove.

Also open is Faena Bazaar, which will have retail space and Faena Park, a four story automated garage for 235 spaces.

The last building that needs to be completed in the Faena District is the Faena Versailles Classic, which has been put on hold and is now covered with a red draping.

Previous construction photos of the Faena District can be viewed here.