Avant At Met Square Reaches 15th Floor

Avant at Met Square

Avant at Met Square

Avant at Met Square is starting to grow taller since we last looked at the project in July.

The 42 story building will have two levels of retail, plus a luxury 19 screen movie theater. 

Construction is expected to be completed by first quarter 2018.

Previous construction photos of Avant at Met Square can be viewed here.

Park Grove Rising Taller

Park Grove Rising Taller

When we last looked at Park Grove in July, construction was just starting to go vertical on the project located in Coconut Grove. 

The Club Residences, located on the North end of the property has reached the 6th floor. Two Park Grove, the middle tower has also reached the 6th floor which will top out at 20 stories. 

Construction is also progressing on the new Coconut Grove Bank and is scheduled to open first quarter 2017. As soon as the new Coconut Grove Bank is completed, the current Coconut Grove Bank on the property will be demolished and construction will begin on One Park Grove. On top of the new Coconut Grove Bank, construction has already started on the amenities deck of Park Grove which will feature 4 pools, private cabanas and a signature restaurant by Michael Schwartz. 

Read More

Jade Signature Tops Off

Jade Signature

Jade Signature

The 57 story Jade Signature located in Sunny Isles Beach has topped off. 

A year ago, the luxury condominium just reached the 15th floor. The Herzog & de Meuron designed building is expected to be completed by Summer 2017.

Previous construction photos of Jade Signature can be viewed here.

Paramount Miami Worldcenter Concrete Pour Scheduled This Weekend

Paramount Miami Worldcenter is scheduled for a foundation pour this weekend, which will use over 100 trucks and take over 30 hours, according to Curbed Miami.

New renderings were revealed earlier in February, while the official groundbreaking took place in March.

Photos of the entire Miami Worldcenter site in 2014 can be viewed here.

New World Tower Sold For $84M

New World Tower Miami

The New World Tower office building in Downtown Miami has sold for $84 million, according to Curbed Miami.

The 30 story office tower located at 100 South Biscayne Boulevard was built in 1963 and has 324,407 square feet of space. 

The buyer of New World Tower is East End Capital who also recently developed The Wynwood Arcade and the proposed Wynwood 25. East End Capital plans to spend $10 million on upgrading the building.

New World Tower last sold ten years ago for $60.4 million. 

Maizon Receives Approval

Maizon Location in Red

Maizon Location in Red

After revealing plans in May of this year, Maizon has been recommended for approval from the Urban Development Review Board.

The 24 story Maizon is located in the ever changing West Brickell area and will have 262 rental units.

Maizon is being developed by ZOM, who also developing the under construction Solitair Brickell and Avant at Met Square in Downtown Miami. Maizon was designed by MSA Architects. 

Construction is expected to start first quarter 2017.

Faena Versailles Has Been Put On Hold

The Shell of the Faena Versailles

The Shell of the Faena Versailles

The planned two tower Faena Versailles Classic and Faena Versailles Comtemporary in the Faena District has been put on hold and may by turned into a hotel instead, according to The Real Deal. 

Just a year ago, Faena House and Faena Hotel Miami Beach were completed, while construction progressed on Faena Bazaar and Faena Forum.

The almost completed Faena Forum is expected to open November 27, in time for Art Basel 2016.

Previous construction photos of the Faena District including Faena House and Faena Hotel Miami Beach can be viewed here.