1010 Brickell Getting Closer To Completion

1010 Brickell

1010 Brickell

1010 Brickell is getting closer to completion since we last looked at the project in April. A year ago, 1010 Brickell had just reached the 41st floor.

Most of the blue protective covering has been removed from the balconies and the rooftop amenities deck is nearly finished with water in the pool.

Previous construction photos of 1010 Brickell since the demolition of the parking garage can be viewed here.

31 Story Parcel B Planned For Downtown Miami

Parcel B Rendering

Parcel B Rendering

A 31 story apartment building has been proposed for Downtown Miami called Parcel B, according to The Next Miami. 

Located at 40 NW 3rd St, Parcel B, designed by Zyscovich Architects and Frances Anillo Toledo, will have 300 apartment units with 44 studios, 124 1-bedroom units and 132 2-bedroom units. There will also be a 369 parking spaces and 5,000 square feet of retail.

The site is located next to where Moishe Mana is planning a 49 story rental tower.

Cranes Removed At Park Grove

Since topping off in March, the crane is being removed at the Club Residences of Park Grove. One crane has been removed from Two Park Grove with the third crane coming down soon. 

Previous construction photos of Park Grove can be viewed here.

Conrad Hotel Brickell Sells For $72M

Conrad Hotel Brickell in the Brickell Arch

Conrad Hotel Brickell in the Brickell Arch

The Conrad Hotel in the building Brickell Arch has sold for $72 million, according to The Miami Herald and was purchased by Mast Capital. 

The Conrad Hotel with 203 guest rooms, is located at 1395 Brickell Avenue and is within the building Brickell Arch, which sold for $142 million in September 2015 to Dallas based Gaedeke Group. The hotel has been listed for sale since July 2015 and was expected to sell for over $100 million at the time.

Originally called Banco Espiritu Santo, the 36 story building was completed in 2004 and designed by Kohn Peterson Fox Associates. The building is known for its 30 story arch on the front façade of the glass. 

Mast Capital is planning on renovating the lobby, pool, restaurant and guest rooms.

Melo Group Purchases Downtown Miami Lot For $10M

Melo Group has purchased a 45,433 square foot lot located at 501 North Miami Avenue for $10 million, according to The Real Deal.

The lot was sold by the First Baptist Church and as part of the deal, Melo Group must build a 300 space parking garage for the Christ Fellowship Baptist Church. 

Zoning allows for an 80 story building to 1,131 feet with up to 1,043 residential units.

The Northern 35,992 square foot part of the lot was sold for $18.1 million in March to Okan Group with plans to build a mixed use building. 

Demolition Underway At 3480 Main Highway

3480 Main Highway Demolition

3480 Main Highway Demolition

Demolition has started on two buildings located at 3480 Main Highway in Coconut Grove. 

The two buildings being demolished were built in 1937 and 2010. Plans are to build a five story class A office building with a rooftop restaurant. The site is located next to the abandoned Coconut Grove Playhouse.

The properties were purchased by Optimum Development USA in 2014 for $8.5 million. Optimum Development USA also purchased the Starlite Motel in Brickell for $25 million in 2014.

Brickell Flatiron Reaches 10th Floor

Brickell Flatiron Construction

Brickell Flatiron Construction

When we last looked at Brickell Flatiron in May, construction reached the 6th floor. Construction has now reached the 10th floor and will rise 65 stories over Brickell.

Brickell Flatiron started going vertical in February of this year and groundbreaking starting March 2016.

Previous construction photos of Brickell Flatiron can be viewed here.

June 2017 Construction Progress Video